Références Réseaux Sociaux

Avidan Engineers 09/22

Parametric tunnel design.
Using SOFiSTiK text editor to create tamplates for 3D brick models with construction stages.
creating the model in minuts with a few parameters, running time is a different story...

#design #tunnelling #sofistik #fem #geotechnics
 

Voir le post

Ntseuoa Motsieloa Pr Eng 09/22

Stability Design of Multi-Story Building

#buildingconstruction
#StructuralEngineering
#LateralStability#buildingRehab
 

Voir le post

Marko Marić 09/2022
Spans/ portées : 26.50+5×33.00+26.50 [m]
Pier height(s)/ hauteur(s) des piles : from/de 7 to/à 10 [m]
This one is my favorite so far.
There is still work to be done here, but I am very enthusiastic about it.
 It is a semi-integral cast in place structure, inspired by the great article on autoroute A9 in Switzerland, authors: Philippe MenétreyClaude Broquet and Stefan Nydegger from 2012. Analysis is performed using SOFiSTiK AG
--
C`est ma favorite jusque à présent. Il y a encore des vérifications à faire dans le model, mais je prends beaucoup d`enthousiasme à ce type de pont. Il s’agit d’une construction semi-intégrale, en béton coulée, un ouvre inspirée du magnifique travail effectué par les @Philippe Menétrey, @Claude Broquet @Stefan Nydegger en 2012 sur l`autoroute A9 en Suisse. Logiciel d'analyse SOFiSTiK France
#bridgeengineering

Voir le post

 

Leonhardt, Andrä und Partner Beratende Ingenieure VBI AG 09/2022

"Kilian Karius visiting the SOFiSTiK AG booth at the footbridge 2022 conference in Madrid.
For the Varvsbron multiple global and local models were set up at detail design with the software package of Sofistik AG to optimise the structure for efficiency and performance.
Two global models were employed: the main model is based on beam elements while a refined model uses shell elements to represent the area around the pylons. Both models are aligned with each other in order to correctly capture the load-deflection behaviour of the monolithic area on the one hand and to cover the multitude of load cases with acceptable calculation time on the other hand.
#design #software #bridge"

Voir le post

Nikodem Gorski 09/22

 

Simple procedure for stiffness calculation of spring elements reproducing partial mobilisation of passive earth pressure. Example is calculated with SOFiSTiK software. Looking forward to Your comment Marko.

Voir le post

 

Marko Marić 09/2022

"From conception to realisation!
Very excited to see the hard time designing bridge has payed off.
It is a very simple post-tensioned integral concrete bridge.
Analysis was performed using SOFiSTiK AG

#bridgeengineering #bridgeengineering"

Hier gehts zum Post

Avidan Engineers 03/2022

« Green line, Section G1 LRT.
Yesterday, the beams of the third span of "Ha'Merkava" bridge were placed.
The bridge has a length of 90m' with three spans, the super structure is made of precast composite beams with the combination of pre-tension strands and post-tension tendons.
The design was done by AVIDAN engineers together with SYE engineering. Construction stages and the combination of different prestressing methods were modeled with SOFiSTiK.
#LRT #bridgedesign #sofistik #precastconcrete #construction #prestressedconcrete »

Voi le post

Boren Žunac 03/2022

« Nonlinear (compression only) boundary condition in time history analyisis.
#sofistik #structuralengineering »

 

Voir le post

Mahmoud Taha 02/2022

« The Way to RFT :D
Moving Load Analysis »

 

Voir le post

Ekaterina Goloviznina 02/2022

« This is an analysis of a massive concrete bridge support. It is my next step in exploring Hydra (SOFiSTiK's multiphysics module). Now I took into account construction stages, concrete self-heating and stiffness development due to hardening.
In addition to my previous knowledge in heat transfer analysis, I learned such powerful tools as heat source function and concrete stiffness development models. Using Hydra and ASE modules together, I was able to calculate and visualize concrete temperature and principal stresses I (max. tension) with 6-hour time step. #SOFiSTiK #HYDRA #ASE #concretehardening #bridge #heattransfer #thermalanalysis »

Voir le post

Andrey Golovin 01/2022

« #SOFiSTiK »

 

Voir le post

SERS INGENIERIE 12/2021

« Les équipes SERS participent aux études de conception et d’exécution d’un projet de construction de locaux professionnels à Brest. Cet ouvrage prévoit la construction d’un immeuble de bureaux d’environ 3300m² en R+3 avec un niveau de sous-sol à consacrer à un parking. Dans le cadre du développement de notre expertise BIM, notre équipe a entièrement traité ce projet via une plateforme BIM combinant les outils REVIT et Sofistik. [...] #batiment #structures #bureaudetudes #ingenierie #structuraldesign #civilengineering #sers #sersbm #bim »

Voir le post

COWI 12/2021

«  #DidYouKnow that there is only one route to get to Patagonia in Southern Chile and that you have to cross over two suspension bridges to do so? These suspension bridges are therefore critical infrastructure and recently suffered from some failures of components. " [...] We developed a methodology using SOFiSTiK structural software with suspension cable tuning and non-linear analysis to capture the unique behaviour of each bridge. With this methodology, we were able to closely match the actual bridge behaviour and converge theoretically on a probable cause of the issues observed in the field and were able to design targeted retrofits to prevent further issues. #infrastructure #planning #bridgengineering »

Voir le post

Houssem Boutahraoui 11/2021

« As engineers me and my friend Yahia Alloun we share with you a proposed solution for protect the building with software sofistik.
#building #engineers
#sofistik #geotechnical #civilengineering #travauxpublics #teddy #FEA #BIRMOURDRAYES »

 

Voir le post

Houssem Boutahraoui 11/2021

« Passerelle piétonne
#TEDDY #SOFiSTiK #bridge #sofistik »

 

Voir le post

 

 

 

 

Dragan Zrnić 11/2021

« When wanting something to optimize, mimic nature, because she knows best. [...] Parametric modeling of the structure enabled the relatively quick exploration of the effects of changing individual parameters on the behavior of the whole structure.  Analysis of the results showed that it is no coincidence that the existing bridges of this type are pedestrian bridges.:) For control analysis of results has been used SOFiSTiK AG. [...]
#optimization #exploration #formfinding #bridgedesign #branchingstructures #computationalengineering #computationaldesign #parametricdesign #Grasshopper #Karamba3D #Galapagos #Sofistik #structuraldesign #programming #stahlbau #sofistik »

Voir le post

Pondio Ingenieros 10/2021

« Pondio Ingenieros alongside BRISSA SL has carried out a project for SACYR (SACYR COLOMBIA) of more than 20 bridges in the Pamplona - Cúcuta roadway corridor in Colombia. In addition to the project, we continue to participate in the monitoring and technical assistance during the construction of all bridges. [...] The area of Cúcuta has a high seismicity, which has been a key element in the design of the bridge. The image below shows the finite element model made with Sofistik software (SOFiSTiK AG) reproducing all the details of the bridge.

#construction #design #software #colombia #project #SOFiSTik »

Voir le post

Pondio Ingenieros 10/2021

« Computational model of our proposal for the Porto Metro bridge with SOFiSTik (SOFiSTiK AG).

Modelo de cálculo de nuestra propuesta para el puente del Metro de Oporto con SOFiSTik (SOFiSTiK AG).

COBA - Consultores de Engenharia e Ambiente;Pondio Ingenieros; thomas LAVIGNE;MICHEL VIRLOGEUX CONSULTANT; Metro do Porto

#SOFISTIK #civilengineer #structure #design #project #engenharia #consultores »

Voir le post

Marino Ožbolt 10/2021

« If you don’t live on the edge you will never see the view.”
Cantilever scaffolding structure for south portal of tunnel Komorjak in construction.
#strabag #teamswork #tunnelling #croatiafulloflife »

 

Voir le post

Ana Sánchez Corujo 09/2021

« Canopy Bota Solar

This canopy of 150 tons of steel has been installed on top of an existing building in the city center of Brussels. Its main objective is to generate solar energy for the building. The structure is composed of 2 portal frames that hold a hanging roof where the solar panels are installed. The shape of the roof was optimized following a catenary, and works as a tension-compression structure depending on the direction of the wind. The mounting of this structure was definitely a challenge.
[...] #Sofistik #hangingroof #Brussels #architecture #structuralengineering »

Voir le post

Dirk Muenzner 09/2021

« Punktlandung in der Baulücke - das SCC Stuttgart Cancer Center - Tumorzentrum Eva Mayr-Stihl
[...] Die Leistungen der Tragwerks-planung werden Boll und Partner. Die Gründung erfolgt über eine gemischte Flach- in Teilbereichen Tiefgründung - also ein hoher Anspruch an die Setzungsverträglichkeit, die wir mit dem CSM- Modul der Berechnungssoftware von Sofistik abbilden konnten. [...]. #BIM #sofistik #bup »

 Voir le post

Hartinger Consult 09/2021

« Fußgängersteg in Thannhausen über die Mindel

#stahlbau #sofistik #leichtebauweise #ingenieurbau »

 

Voir le post

Adrian Blonka 08/2021

« The first series about modelling parametric geometry in Rhino and Grasshopper for SOFiSTiK calculations.
Part 1 - Introduction and modelling Beams. »

 

Voir le post

Avidan Engineers 08/2021

« Parametric bridge design.
Bridge 101 Road 16, to Jerusalem.
Using a short code to define all construction stages and pre stressing tendons, can save a lot of precious time. This code can be copied to another balanced cantilever bridge regardless of the bridge axis geometry, number of spans, segments, or tendons...

#TEDDY #SOFiSTiK #bridge #balancedcantilever #prestressedconcrete »

Voir le post

Kirill Goloviznin 08/2021

« My first Rhino-Grasshopper-SOFiSTiK experience.
Parametric cable-stayed bridge.

This tutorial helped me get started:
https://lnkd.in/gaWRe_xi »

 

Voir le post

Katrin Baumann - Arup 07/2021

« TORRE SKYLINE LAS LOMITAS

Torre para viviendas de 33 pisos ubicada en Lomas de Zamora, en la zona sudoeste del Gran Buenos Aires [...]
Superficie total edificable del proyecto: aproximadamente 11.690m².

Proyecto Lanati Arquitectos
Desarrollo y Construcción: Barón SA
#proyecto #ingenieria #estructuras #edificios #hormigon #argentina #construccion #sofistik »

Voir le post

SERS INGENIERIE 07/2021

« Les équipes SERS participent aux études d’exécutions d’ouvrages d’arts sur le Grand Paris. A titre d’exemple, le Pont à l’Est constitue un des ouvrages étudiés par nos équipes et dont les plans de coffrages sont réalisés à partir d’une maquette 3D Revit réalisée à l’aide du plugin Sofistik Bridge Modeler. L’ensemble des sujets de préfabrication et de phasage de réalisation et pose des éléments sont également intégrés dans la maquette 3D permettant d’enrichir notre maquette BIM d’informations essentielles. [...] »

Voir le post

Dragan Zrnić 07/2021

« One more example which shows possibilities for practical using of link between SOFiSTiK AG and RHINO 3D GRASSHOPPER 3D. For the illustration have chosen one classical frame bridge. Most of structural elements are parameterized and dimensions can easily get change and fast export from GH in Sofistik. Horizontal inclination of supports is not considered. This was only short GH exercise…
#ParametricCurvedFrameBridge #Geometryexport #Grasshopper #Sofistik »

Voir le post

METRA Ingenieros 07/2021

« TORRE SKYLINE LAS LOMITAS

Torre para viviendas de 33 pisos ubicada en Lomas de Zamora, en la zona sudoeste del Gran Buenos Aires [...]
Superficie total edificable del proyecto: aproximadamente 11.690m².

Proyecto Lanati Arquitectos
Desarrollo y Construcción: Barón SA
#proyecto #ingenieria #estructuras #edificios #hormigon #argentina #construccion #sofistik »

Voir le post

Dipl.-Ing. Dirk Muenzner 06/2021

« Digitale Bestandserfassung - Mit unserem auf die Erfassung von Tunnel- und Garagenbauwerken optimierten Messverfahren können Bestandsbauwerke schnell und präzise erfasst und in ein BIM- Modell überführt werden. Schäden werden mittels Künstlicher Intelligenz ausgewertet und erkannt sowie ebenfalls in das BIM- Modell überführt. Dies ermöglicht eine fundierte Planung der Erhaltungsmaßnahmen und die Beobachtung der Schadensprogression. #AI #BIM #INFRASTRUCTURE »

Voir le post

Mahdi Ketfi 06/2021

« Immersion sur le chantier d’un projet d’envergure sur lequel je travaille actuellement : Testimonio II. [...]
Notre équipe du bureau d’étude Structures Engineering - SENG est mobilisée sur les études d’exécutions de la grande fouille, l’école et les logements privés qui ont nécessité : Une Modélisation globale non linéaire et phasée suite à la construction « up and down » sur le logiciel SOFiSTiK AG  
L'usage du Bim avec le logiciel Revit d' Autodesk [...] »

Voir le post

Distorzija d.o.o. 05/2021

« Construction sequence of viaduct Dumanja jaruga I on approach road to bridge Peljesac, section Duboka -Sparagovići/Zaradeže.
#bridgedesign #freecanteliver #prestressedconcrete #sofistik #csm #distorzija #tempusprojekt #strabag »

 

Voir le post

Structures Engineering - SENG 05/2021

« Tunnel Schlœsing à Marseille, pour le groupement conception construction :
GTM Sud - Eiffage Génie civil - Santerne – Eiffage Energie Systèmes. Le BET #SENG finalise les études d'exécution de la Brettelle Schlœsing. Il s’agit d’une tranchée couverte de 500 m de longueur environ, entre le tunnel Prado Sud et le boulevard Schlœsing. Pour ce projet, on notera l’élaboration d’une maquette 3D globale sous Revit, ainsi que la réalisation de modélisations 3D spécifiques à chaque zone du tunnel, sous Sofistik. #SENG #Revit #Sofistik #dynamo #Pieux #Tirants #Palplanches #Micropieux #Marseille »

Voir le post

BPR Dr. Schäpertöns 04/2021

« Anfang vergangener Woche hat Daniel Schäfer, unser Bereichsleiter für den Konstruktiven #Ingenieurbau, im Rahmen des Vertieferfachs #Stahlbrückenbau, an der Hochschule München eine online Vorlesung gehalten. Inhalt war u. A. die von uns geplante #Netzwerkbogenbrücke über die A9 bei #Nürnberg. Neben #Entwurf, #Planung und #Bauablauf der #Brücke wurden unterschiedliche Varianten, sowie die Vor- und Nachteile von Netzwerkbogenbrücken im Allgemeinen erläutert. [...]
#BPR #Nachwuchs #Bildung #Vortrag »

Voir le post

Clemens Schweighofer 04/2021

« Nächstes Projekt voll in Bearbeitung...
Planung einer Niveaufreimachung als Weiße Wanne mit Überfahrtsbrücken als WIB-Tragwerke...Die Herstellung erfolgt mit Hilfe wasserdichter Spundwandkästen, DSV-Sohle und unter Einsatz von Hilfsbrücken.
Having a blast with BIM and Revit...
#BIM #Brückenbau #bridgeengineering #bridgedesign #SBIM #SBM #Revit #Sofistik #3dModelling #BridgeModeler #infrastructure #ifc #dynamo #parametricdesign #enscape #lumion #visualisierung #render »

Voir le post

Sandipan Dhar 04/2021

« Apart from keeping at pace with the zooming fast technologies, learning new tech tools/softwares all by yourself teaches you a great deal of patience, perseverance and ultimate problem solving skills. P.S - Basic preliminary model of Steel Composite girder with CSM in Sofistik, Sofiplus-X, Teddy. Way more to go with grillage/bracing modelling in the upcoming days.
#learning #sofistik #parametric #modelling #structuralengineering #coding #civilengineering »

Voir le post

Rasmus Sainmaa 03/2021

« Messing around with Grasshopper #sofistik connection, also creating a #tekla BIM model simultaneously. All from few lines drawn in #Rhino , Grasshopper algorithm does the rest :)
Also testing sketching objects with relative locations and transformations.
Disclaimer: this is a terrible bridge design, just playing around with the developed tools... ?
#grasshopper #grasshopper3d #bim #sweco #bridges #algorithm #parametricdesign #pdaas »

Voir le post

Arun Mohankumar Kunnanchira 03/2021

« One of our Norwegian projects under construction. One year ago i posted a snapshot of the #SOFiSTiK analysis model of a three span continuous post tensioned pedestrian bridge. This bridge is now near completion after going through different cycles of analysis, design and BrIM modelling.
Feels really good when you see your designs becoming reality !!
#COWI #bridgeengineering »

Voir le post

Ravi Shankar 03/2021

« Glad to share the learning on SOFiSTiK AG and Grasshopper, completed modeling of Arch bridge of 150 Span(Concrete Arch Bridge)
#sofistik #grasshopper #userinterface #bridgeengineering »

 

Voir le post

PBW Computational Team 02/2021

« First approach to safety net impact analysis.

#structures #bridges #pbw #mechanics #SOFiSTiK #FEM #net #safety #steel #Geometry #Nonlinear #Dynamic »

 

Voir le post

Structures Engineering 02/2021

« Dans le cadre de sa mission « Etudes structures pour la réalisation du projet TestimonioII» :
#SENG a fini les études structures côté parking pour les 13 niveaux réalisés en taupe.
Le SS02 est en cours de réalisation et les travaux de l'école internationale sont lancés.
#SENG #Modélisation »

Voir le post

Dirk Münzner - Boll & Partner 02/2021

« Baubegin am SCC Stuttgart Cancer Center - Tumorzentrum Eva Mayr-Stihl
Gustav Epple hat den Zuschlag für den Neubau des „Haus G“ vom Klinikum Stuttgart erhalten und errichtet dort als Generalübernehmer bis Frühjahr 2024 schwerpunktmäßig die zukünftigen Bereiche zur Behandlung von Krebserkrankungen. Die Leistungen der Tragwerksplanung übernimmt Boll und Partner. Gemeinsam mit Gustav Epple und den Architekten SPA werden die Planungen nach der BIM- Methode erbracht, die erforderlichen Berechnungsmodelle können so direkt abgeleitet werden und mit der Software Sofistik berechnet werden. [...] »

Voir le post

 

METRA Ingenieros 01/2021

« Widening of a historical arch bridge over Arroyo Toledo, Uruguay. The existing structure is a 9 meter long masonry bridge, with a 1.8m rise.
The enlargement is designed with precast concrete pieces with an 'inverted-T'section. A layer of on-site concrete is to be executed between the nerves of the pieces, in order to bond them together.
[...]

#bridge #concrete #engineering #structures #puente #hormigon #ingenieria #estructuras »

 

Voir le post

Dario Madrid 01/2021

« La modélisation de la passerelle du franchissement urbain de PLEYEL est terminée et l’exploitation des résultats démarre avec cette année 2021!

Plus qu’une simple passerelle, l’ouvrage est composé de caissons orthotropes sur toute sa longueur (304m) avec des zones dépassant 20m de largeur. Le tout est soutenu par des structures en treillis nommés bulles, composées de petits caissons métalliques avec des croisements entre les filants et les arcs, et se raccordant aux caissons principaux via des émergences appelées nez. [...] »

 

Voir le post

Manish Mehta 01/2021

« Hello Everyone! I would like to share my learning as a new #sofistik user. Recently I have developed a script for longitudinal analysis of parametric RCC girder pedestrian bridge. This script includes integration of MS-Excel, Rhino-Grasshopper and SOFiSTiK where user needs to enter the inputs for geometry (cross section and span lengths), loadings, support conditions and mesh size for the FE model in the Excel and script automatically generates results in the form of report as a output from SOFiSTiK. [...]
#parametricdesign #sofistik #grasshopper #structuraldesign #scripts #structuralengineering #ramboll »

Voir le post

Felix Nowak 01/2021

« I am sure it's not new to you that voided #unidome slabs can be designed with any structural software- without any additional efforts.
If you are using SOFiSTiK by SOFiSTiK AG you can now even automatically get your slab results correctly distinguishing between your voided areas and your solid areas. With just one click! Get in touch to find out how !


#unidome #ingenieur #bauingenieur #nachhaltigkeit #sustainability »

Voir le post

Avidan Engineers 01/2021

« Green Line G3.2 LRT project Tel-Aviv. Kaplan station - laskov entrance.

the entrance is constructed close to existing high rise building and three levels of underground parking lot. after constructing the entrance, a TBM is launched from the station passing beneath the entrance (just 60 cm below the floor), a second machine is launched 12.5 m' west to the first TBM.

This model examines the stability of the entrance, tunnel ring and adjacent building impact. at stage 15-29 we force the system to fail by reducing the cohesion and friction angle, this way we can assess the safety factor. the safety factor achieved is 2.45. »

Voir le post

Ton Boeters 01/2021

« Staal-beton bruggen in Nederland. Zo vaak kiezen we niet voor de combinatie waarbij het betondek als (druk)flens van de stalen liggers werkt, terwijl het constructief gezien een aantrekkelijke oplossing is waarbij het dek meewerkt in de hoofddraagconstructie. Daarnaast is het betondek minder gevoelig voor de vermoeiingsbelasting vanuit verkeer. [...]

Namens Royal HaskoningDHV ben ik constructeur van deze ca. 120m lange staalbetonbrug in opdracht van Ballast Nedam #bruggen #staal #beton #sofistik »

 

Voir le post

Dirk Münzner - Boll & Partner 01/2021

« Fertigstellung Astyx-Campus
Den neuen Technologie- und Innovationsparks (TIP) in Ottobrunn bei München prägen große Glasflächen und markante Auskragungen die vierstöckigen Neubauten mit 6400 Quadratmetern Bürofläche. Für beide nun fertiggestellten Astyx-Gebäude hat Boll und Partner die Tragwerksplanung erstellt [...]. Für die Planung wurde die effektive Kombination aus der BIM- Software Revit und dem Berechnungsprogramm SOFiSTIK erfolgreich eingesetzt. #bim #sofistik (Foto: Gustav Epple) »

 

Voir le post

Dirk Münzner - Boll & Partner 01/2021

« Anders.Bauen. - Neue Hauptverwaltung Gustav Epple
[...]. Durch Boll und Partner wurde die Entwurfs- und Ausführungsplanung erstellt. Neben der architektonisch, technisch und handwerklich außerordentlich spannenden Konstruktion (Architekten: Ackermann und Raff) wurde durch die Baufirma großer Wert auf eine durchgehende Bearbeitung mit BIM gelegt, mit Erfolg! Insbesondere die direkte Ableitung und Berechnung der FE- Modelle mit SOFiSTiK war eine große Erleichterung bei der Variantenuntersuchung und der Nachweisführung. #BIM #sofistik »

 

Voir le post

Andreas Riege 01/2021

« Tatkräftig starten wir ins neue Jahr.

In dieser Serie zeige ich den #BIMWorkflow zwischen einem #BIM-Architektur-Modell und der statischen Berechnung mit #Revit und #Sofistik - dieses Zusammenspiel nennen wir liebevoll #Revistik.

Im ersten Teil stelle ich die Anpassungen dam Berechnungsmodell vor, inPart II geht es dann um Auflagerbedingungen und in Part III werden Lasten eingegeben und Ergebnisse berechnet. »

 

Voir le post

Avidan Engineers 12/2020

« AVIDAN engineers together with SYE engineers LTD has been selected for the detailed design of G1-3, G1-6.
The project consists of two bridges, 200 meters length each, above road no’ 4 and two vehicular underpass structures carrying two LRT tracks.
The bridges will be designed and constructed by incremental launching to avoid traffic diversion.
The underpass structures will be designed by top-down method.
#topdown #incremental #sofistik #lrt #bridgedesign »

 

Voir le post

Gabriel Neves - Tekla/Trimble 12/2020

« https://lnkd.in/ef6G6qq
Here a teaser for the new MoB episode. This time an Interview/Demo with Mateusz Lapinski (WSP w Polsce). Mateusz won Poland Tekla BIM Awards competition and was a runner up to the global competition with his full BrIM Dunajec River Bridge. SOFiSTiK AG/RHINO/GRASSHOPPER /Tekla Software. The whole spread for a perfect bridge workflow! He did it all by himself. [...] #teklastructures #sofistik #rhino3d #grasshopper #trimbleconnect #wsp #bim #brim #bimworld #ministryofbridges »

Voir le post

Abhisht Sharma 11/2020

« Glad to share the learning on SOFiSTiK AG , completed modelling of assessment of bridge 80 m span tied concrete arch .
Sitam Choudhury
#engineeringlife #bridges #ramboll #sverige #BK04
#sofistik
cc: Tony Janhunen »

 

Voir le post

Dirk Münzner - Boll & Partner 11/2020

« Richtfest: #Buntweberei - Mit einem schönen Fest und einer mitreißenden Videodokumentation (https://lnkd.in/dYdnbWj) wurde vor Kurzem das Richtfest der neuen Firmenzentrale und der Erlebnisgastronomie mit Hotel in der Buntweberei in Eislingen gefeiert. Wir gratulieren dem Bauherrn Herrn Salvia und der ausführenden Firma Gustav Epple. Die Planung wurde von Boll und Partner nach dem BIM- Methode und mit direkter Ableitung der FE- Modelle (sofistik) erstellt. #BIM #Sofistik »

Voir le post

CTE Paris 11/2020

« CTE réalise le diag d'un ouvrage industriel sous Sofistik au menu, calcul du 3ème ordre (grand déplacements) avec prise en compte par itération non linéaire de la fissuration de section béton (précontrainte adhérente).
utilisation de la surtension des câbles dans le recherche de stabilité non linéaire sous Sofistik ... »

 

Voir le post

Shadi Sabra 11/2020

« Passion for Learning, first try with #Sofistik
#Seismic #Analysis
Design coming soon
#structuralengineer #BIM #Revit #selflearning »

 

Voir le post

CTE Paris 10/2020

« CTE augmente sa capacité de calcul avec Sofistik.
Calculs non linéaire, push over sur éléments de types coques, calcul avec accélérogrammes, plastifications, précontraintes avec phasage ....»

 

Voir le post

Stellar Engineers 10/2020

« Launching Design of 110m span Steel Truss over Railway Tracks.

#bridgedesign #bridgeconstruction #steelstructures »

 

Voir le post

Dirk Münzner - Boll und Partner 10/2020

« BIM- Ausführungsplanung S21 Neckarbrücken: Im Zuge der Neubaustrecke Stuttgart-Ulm erstellt die Firma MaxBögl drei Bahnbrücken. Die Ausführungs-unterlagen wurden von Boll und Partner in den letzten 4 Jahren durchgängig mit der BIM- Methode erstellt, vom Erdungskabel über Längs- und Querspannglieder bis zu sämtlichen Entwässerungsleitungen.

#bim #infrastructure #bridges #s21 »

Voir le post

Ana Saguier Padilla - METRA Ingenieros 10/2020

« BRIDGE OVER RIO NEGRO (PICADA DE ORIBE), URUGUAY
The project features a 375m long bridge, over the Rio Negro [...]. The spans are 27.5m-35m-35m-27.5m long, and continuous. The deck is composite, consisting of a concrete slab on two steel plate girders. The bridge requires a series of concrete piles to be driven up to 20 m into the ground. [...]

#sofistik #bridge #structure #design #engineering »

Voir le post

Structures Engineering SENG 10/2020

« Dans le cadre de l'opération d'aménagement "Boulevard Urbain Sud" à Marseille, #SENG, chargé de l’étude des structures, a réalisé un calcul au feu de la tranchée couverte, selon le guide du CETU "Comporte-ment au feu des tunnels routiers". La structure est calculée pour résister à 2 heures de feu HCM [...]

#Calcul_au_feu #Modélisation #Dimensionnement_structures #Structures_Engineering »

Voir le post

Clemens Schweighofer 10/2020

« BIM Modell einer Straßenbrücke mit Radweg...Bearbeitung in vollem Gang...

 


#BIM #Brückenbau #SBIM #SBM #Revit #SOFiSTiK #3dModeling #BridgeModeler #bridgeengineering #bridgedesign #infrastructure #ifc #ProVI #Infrastruktur #enscape #dynamo #parametricdesign »

Voir le post

Neeraj Tripathi 10/2020

« Started learning #SOFiSTik. I modelled some solid and hollow sections by defining cross section, applied some general loadings. Its fun and exciting to have a hands on experience on this platform. I am exploring a lot of options and aiming towards becoming a proficient user.
#learning #SOFiSTik #Autodesk #structuraldesign #structuralengineering »

Voir le post

Ahmed Sami 10/2020

« Modeling and Design Using Revit 2020 and Sofistik FE Project : Manchester City Football Academy in AlBurouj Compound New Cairo SOFiSTiK Middle East SOFiSTiK AG [..]

#revit2021 #3dmodeling #bimservices #bridgedesign #finiteelementanalysis #structuralmodeling #capitalprojects #structuralgeology #robot_structural_
analysis
#rebar_detailing #sofistik #sofisticação »

Voir le post

Aaron Levy - Amy Metom Engineers & Consultants LTD 10/2020

« Just came across this nice project and reference, thanks Aaron Levy from http://eng.amymetom.co.il for this article.


#revit #bim #sofistik »

Voir le post

Clemens Schweighofer 10/2020

« Statisch konstruktive Planung einer Geh- und Radwegbrücke bestehend aus Vorlandbrücken in Stahlbetonbauweise und einer Flussbrücke welche als Hängebrücke in Stahlbauweise projektiert wird. [...] herausfordernde Aufgabenstellungen bei Formfindung, Bauphasen und den statischen und dynamischen Berechnungen.

#SOFiSTiK #FEA #bridgeengineering #bridgedesign #infrastructure #dynamics »

Voir le post